Maurice came to look at the vibration issue.
He thinks the problem is with the upper rudder post bushing which is wearing. He will machine a new bushing.
Rewired much of the boat. Replumbed the boat. Saturday and Sunday.
Work done:
New sink in head
New faucets in head and galley
Rewired DC Panel, epoxy board behind panel
Fixed all mast and navigation lights
Bilge blower to be done
Fixed V-berth hatch so it does not fall over and tiewrap the rod so cover
does not fall back.
New AC Panel
New Outlet in galley
new fresh water system and accumulator tank and stainless steel braided hoses
to water pumps
LED lights in cabin
plugged shower oulet so bilge water does not return to bilge
Adjusted winch feeder arms inboard
replaced bilge pump sensor
new hinges on starboard lazerette
Subscribe to:
Post Comments (Atom)
FFR with Alex and Johnny
There were almost no winds. Natalie was invited to cancel, and she did. Shawn and Alex were there, and Johnny was looking for a boat, so he...
-
It was an interesting week at the club. Came down on Friday to help Sylvie if she needed to haul out Tara II. Had supper with the gang. Sat...
-
I had an uneventful Haul-out at 12:30, single-handed. Fuel and pumpout. I helped Eric with pump-out, fueling and winterizing his engine. ...
No comments:
Post a Comment