Maurice came to look at the vibration issue.

He thinks the problem is with the upper rudder post bushing which is wearing.  He will machine a new bushing.

Rewired much of the boat.  Replumbed the boat.  Saturday and Sunday.









Work done:

New sink in head

New faucets in head and galley

Rewired DC Panel, epoxy board behind panel

Fixed all mast and navigation lights

Bilge blower to be done

Fixed V-berth hatch so it does not fall over and tiewrap the rod so cover does not fall back.

New AC Panel

New Outlet in galley

new fresh water system and accumulator tank and stainless steel braided hoses to water pumps

LED lights in cabin

plugged shower oulet so bilge water does not return to bilge

Adjusted winch feeder arms inboard

replaced bilge pump sensor

new hinges on starboard lazerette